A porch is the only project that improves the street view, adds usable room and shelters the front door, all in one move. It is also the one most often built wrong.

4.8 from 18 Google reviews

A porch is not a deck with a roof

The moment you add a roof, everything about the structure changes.

A deck carries people. A porch carries people, a roof, and whatever snow lands on it, and it transfers all of that down through columns into footings that have to be sized for the job.

Columns need to be structural rather than decorative wraps around a thin post. Beams need to be sized for the actual span. Footings go deeper and wider. And where the porch roof meets the house wall, there is now a junction that will channel water directly into your framing for the next thirty years unless it is flashed correctly.

Most of the failed porches we are called to look at fail at exactly two places: undersized columns that have started to settle, and that roof to wall junction. Both are invisible in the finished photograph.

Where the weight goes

Roof to footing.

Scroll to build the porch, from the footings up, and follow its load path down.

Porch, ground up · Typical assembly
  1. Illustration of a house entrance with a new porch floor platform on its foundation

    01 / 04

    Footings and floor frame

    Deeper and wider than a deck, dug to the required depth and inspected before pouring, with the floor frame on top.

    Footings dug to depth and inspected, the floor frame on top.

  2. Illustration of the same entrance with timber porch posts, knee braces, a beam and roof rafters

    02 / 04

    Structural columns and beams

    Load bearing posts and beams sized for the actual span and load. Decorative wraps go on afterwards: they are cladding, not structure.

    Load bearing posts and beams sized for the span.

  3. Illustration of the same porch with its roof finished and tied into the house

    03 / 04

    Roof to the house

    The roof is finished and tied into the house and onto the beam. Most failed porches fail at the columns or the roof to wall junction.

    The roof finished and tied into the house and the beam.

  4. The same house with a finished covered porch, stone steps and an iron rail at dusk

    04 / 04

    Floor, steps and rail

    The porch floor, the stone stair and the guard, built to be inspected, with the trim and lighting on last.

    Floor, stair and guard built to be inspected, trim on last.

What we build

Four kinds of porch, four different permit paths.

The more you enclose, the more the building department treats it as living space. Worth understanding before you fall in love with a drawing.

  1. 01

    Front and covered porches

    Open on the sides, roofed above. The classic move for a house with a bare front elevation: it gives the entrance somewhere to be and gets you out of the rain while you find your keys.

    • 2 to 4 weeks typical
    • Simplest permit path
    • Largest visual impact
  2. 02

    Wraparound porches

    Turning a corner is what makes a porch look original to the house rather than bolted on. Structurally more involved: the roof has to be framed around the corner and tied in on two elevations.

    • 4 to 6 weeks typical
    • Two roof to wall junctions
    • Often needs architectural review
  3. 03

    Screened porches

    The most used room we build. Usable from April to October in Maryland instead of the few tolerable weeks either side of mosquito season.

    • 3 to 5 weeks typical
    • Removable, re tensionable screen systems
    • Still counts as exterior space
  4. 04

    Three season rooms

    Glazed rather than screened, insulated where it earns its keep, finished to interior standard. Talk to us early: enclosing the space frequently changes what the county requires.

    • 6 to 10 weeks typical
    • May trigger energy code requirements
    • Can count toward floor area

The screened versus glazed decision

Neither is wrong. Decide it before design, not after.

Screening keeps the space classified as exterior, which keeps the permit simple. Glazing it starts to make it a room, which may bring in insulation, egress and energy requirements, and may count toward the floor area your lot is allowed.

Build standard

The four details that decide whether it lasts.

  1. 01

    Structural columns

    Load bearing posts sized for the actual roof load, on footings dug to depth and inspected before pouring. Decorative wraps go on afterwards: they are cladding, not structure.

  2. 02

    Flashed roof junction

    Step flashing and a counter flashed termination where the porch roof meets the house. This is the single most common porch leak, and caulk is not a substitute for it.

  3. 03

    The right roof for the pitch

    Porch roofs are usually low slope. Below about 3:12 a shingle will wick water back under the courses, so it gets a standing seam or membrane system instead.

  4. 04

    A finished ceiling

    Bead board or tongue and groove, properly vented, with lighting and fan boxes wired in during framing. A porch with bare joists overhead reads as unfinished forever.

How it runs

Survey to final inspection.

A porch attaches to your house and carries a roof, so it is permitted and inspected throughout. We handle all of it as part of the contract.

  1. Step 01

    Survey and design

    We measure the elevation, check your setbacks and work out how the new roof can tie into the existing one, which is what determines whether a design is buildable at all.

  2. Step 02

    Drawings, permit and review

    Plan set prepared and submitted. Front elevation work in Chevy Chase, Chevy Chase Village and much of Bethesda often needs architectural or HOA review as well; we prepare that pack too.

  3. Step 03

    Footings, columns and frame

    Footings dug and inspected before any concrete is poured, then columns, beams and roof framing tied into the house structure and flashed.

  4. Step 04

    Roof, ceiling and finish

    Roofing, ceiling, screens or glazing, railings, lighting and trim. Final inspection signed off, and the paperwork handed to you for the file.

Porch questions

What people ask us.

Can I add a porch to any house?

Structurally, almost always. The constraints are usually planning rather than physical: front and side setbacks, lot coverage limits, and in some neighborhoods an architectural review board. We check all of that during the survey, before you spend anything on design.

Can you convert my existing deck into a porch?

Sometimes, and it is the first thing to check honestly. An existing deck was engineered to carry people, not a roof, snow and wind uplift. We will inspect what is there and tell you plainly whether it can be reinforced or whether you are better rebuilding the frame, and we would rather lose the job than roof a structure that cannot take it.

Will a porch add value to my house?

A front porch is one of the strongest curb appeal improvements available, because it changes the first photograph a buyer sees. A screened porch tends to be valued for how much it is used. What we will not do is promise you a percentage return: that depends on your street, your comparables and the market at the time.

Do I need a permit?

Yes. Anything carrying a roof and attaching to the house is permitted work in both Frederick and Montgomery County, with footing and framing inspections along the way. We prepare the drawings, pull the permit and meet the inspector.

When should I start?

Earlier than feels necessary. Design, review and permitting on a porch routinely take longer than the build itself, particularly where an architectural board is involved. Starting the conversation in winter is what gets you sitting on it in early summer.

Related

Often part of the same project.

Porches

Start it in winter.
Use it in June.

Design and review take longer than the build. Starting the conversation early is the whole difference.