
Design · Build · Outdoor living
Decks
Built for the gradeyou actually have.
Half the lots in Montgomery County slope. A deck that ignores that ends up as an awkward platform with a ladder to the yard, or worse, one that isn’t safe.
4.8 from 18 Google reviewsSafety first, and we mean it literally
Decks fail at the ledger. Almost always at the ledger.
When a deck collapses, it is rarely the posts or the joists. It is the connection where the deck meets the house: the ledger board.
Two failure modes account for most of it. The first is attachment: nails instead of structural lag screws or through bolts, which pull out under live load. The second is water: no flashing above the ledger, so rain runs behind it, the rim joist rots quietly for a decade, and one summer afternoon the fixings have nothing left to hold onto.
We flash every ledger, bolt to the structure rather than the sheathing, and use proper joist hangers and post bases throughout. It is code, it is inspected, and it is not the place to cut corners.
The connection that matters
The ledger, assembled.
Scroll to put it together the way we do: every deck we build is fixed to the house at a flashed, bolted ledger.
-

01 / 04
Ledger and footings
Siding cut back, the band joist flashed, and the ledger bolted to the structure, never nailed into sheathing. Footings for every post.
Ledger flashed and bolted to the structure, footings for every post.
-

02 / 04
Posts and beams
Posts on post bases over the footings, carrying beams sized for the span.
Posts on post bases, beams sized for the span.
-

03 / 04
Joists on hangers
Every joist hung on a rated connector, with flashing above the ledger so rain is carried out instead of running behind it.
Every joist on a rated hanger, the ledger flashed above.
-

04 / 04
Decking last
Composite or timber on top of a frame that is built to be inspected, then the stair and the guard.
Decking, stair and guard on a frame built to be inspected.
One deck, eight stages
Frame to finish.
Eight photos of one Courageous deck rebuild, in order. No renders, no stock.

01 Old frame out 
02 Ledger flashed 
03 Joists 
04 Posts and stairs 
05 Decking 
06 Rail posts 
07 Finished 
08 Looking out
From our jobs
More decks we built.



Decking materials
Three honest options, and what each asks of you.
What matters is what you will spend, and do, over fifteen years.
- 01
Pressure treated pine
Best when budget is the binding constraint, or the deck is large and low to the ground.
- Maintenance: clean and re seal every 2 to 3 years, without fail
- Realistic life: 10 to 15 years
- 02
Western red cedar
Best when you want real timber and are willing to maintain it.
- Maintenance: annual wash, re oil every 2 to 3 years to hold color
- Realistic life: 15 to 20 years
- 03
Composite or capped PVC
Best when you are staying, and would rather spend weekends on the deck than sanding it.
- Maintenance: wash it. That is the whole list.
- Realistic life: 25 to 30 years
One thing worth knowing
Composite decking is a surface, not a structure. The frame underneath is still timber, and it is what determines whether the deck lasts. A composite deck on an under specified frame is an expensive floor over a cheap building.
Permits
Yes, your deck needs one. We handle it.
Both Frederick and Montgomery County require a permit for decks above a modest height, and for anything carrying a roof. It also frequently triggers setback and, in some neighborhoods, HOA review.
- Step 01
Survey and design
We measure the grade, locate the utilities and check your setbacks before drawing anything, so the design we show you is one that can actually be approved.
- Step 02
Drawings and permit
We prepare the plan set, submit it and manage the review. If your HOA needs to approve the design too, we will give you what they need.
- Step 03
Footings and frame
Footings dug to the required depth and inspected before pouring: the one inspection people are most tempted to skip, and the one holding the whole thing up.
- Step 04
Deck and final
Decking, railings, stairs and lighting, then the final inspection signed off. You get the paperwork, which the next buyer’s inspector will ask for.
Deck questions
What people ask us.
Can you build on a steep slope?
Yes, it is a large part of what we do here. Steep grades mean taller posts, deeper footings and often a multilevel design with an intermediate landing so the stair run is comfortable rather than a fire escape. It produces a far better result than forcing a single platform onto a hillside.
When is the best time to build?
Late winter and early spring, counter intuitively. Everyone calls in May wanting a deck for June, which is exactly when the queue and the permit office are longest. Book in February and you will be using it by the time the people who called in May are still waiting on approval.
Can you repair or extend my existing deck?
Often, and we will inspect it honestly first. We check the ledger connection and flashing, the post bases, the footing depth and the joist hangers. If the frame is sound, re decking and re railing is excellent value. If the ledger was never flashed and the rim joist is soft, we will tell you plainly that patching it is not something we are willing to do.
How long does a deck take?
The build is usually one to three weeks. The permit is the variable: allow several weeks for review depending on the county’s current workload and whether an HOA is involved. We submit early and keep you updated.
Carries a roof?
Then it is a porch.

Decks
Get it designed
for spring now.
Design and permitting take time. Starting early is the difference between using it in June and using it in September.
- Call
- (301) 305 3431
- Hours
- Monday to Friday, 7:30am to 5:30pm
Saturday by appointment