Ground up residential

Custom home building

From a bare lot tokeys in your hand.

Book a free visit Our build standard

One contract, one schedule, one team accountable for all of it, from the first survey of the lot to the keys.

4.8 from 18 Google reviews

Before you buy the lot

The land decides more about your project than the house does.

Two identical houses on two adjacent lots can be very different projects before a single design decision is made.

Slope drives excavation and retaining. Soil and rock drive foundation design. Whether the lot has public sewer or needs a septic system, whether it has water or needs a well, and how far power has to be brought all land squarely in your budget. So do setbacks, easements, floodplain, forest conservation requirements and any stormwater management the county will require.

If you have not yet purchased, talk to us first. A feasibility review before settlement has talked more than one client out of a lot that would have cost them dearly. Already own the land? Bring us the plat, any survey and the deed restrictions, and we will tell you honestly what can be built there before you commission a design.

From our jobs

Inside the build.

Empty room with a new hardwood floor being installed
Empty room with a new hardwood floor going in
Hardwood boards being laid
Hardwood boards being laid
Roof deck being re sheathed
Roof deck, new sheathing going down

How a custom home build unfolds

One lot.
Five stages.

How a custom home build unfolds with Courageous, from the first walk of the lot to the day you get the keys. Scroll to move through the stages.

  1. Illustration of a cleared residential lot behind a curb, with mature trees and a lamp post

    01 / 05

    Lot and site prep

    We walk the lot with the survey, stake the house and its setbacks, put up silt fence, then clear and grade for the foundation.

  2. Illustration of poured concrete foundation walls in an excavated lot, with an excavator and stacked materials

    02 / 05

    Foundation

    Footings are dug below the frost line and inspected before the pour. The walls go up, are dampproofed outside with a drain at the footing, and are inspected again before backfill.

  3. Illustration of a large house in wood framing and sheathing, with roof trusses, scaffolding and a telehandler

    03 / 05

    Framing and sheathing

    Floors, walls and roof framing, then structural sheathing with a water resistive barrier lapped and taped so the shell sheds water. Mechanical, electrical and plumbing rough ins follow, then the framing inspection.

  4. Illustration of the finished stone house with paving, sod rolls and planting still in progress

    04 / 05

    Exterior and landscape

    Roofing, windows, flashing and stone close the envelope. Insulation goes in after the framing inspection and drywall after the close in inspection. Outside, the grade is shaped to drain away from the house before paving and sod.

  5. Illustration of the finished house with an empty paved drive, lawn and planted beds

    05 / 05

    Keys

    Final inspections and the certificate of occupancy, then a joint punch list walk, your warranty documents and every manual in one folder. Then the keys.

What we build in

Standards we do not treat as upgrades.

These are in the base specification. If a client wants to remove one, we will tell you what you are giving up.

  1. 01

    A real air barrier

    Continuous, detailed and tested. Comfort, energy use and long term durability all trace back to this more than to any headline insulation number.

  2. 02

    Managed ventilation

    A well sealed house needs deliberate fresh air. Balanced mechanical ventilation is designed in, not left to leaks and open windows.

  3. 03

    Water management

    Foundation drainage, correct grading away from the house, flashing at every transition, and a roof designed to shed rather than trap.

  4. 04

    Low VOC finishes

    Adhesives, sealants, paints and flooring specified low emission as standard, so the house is genuinely habitable the week you move in.

Custom build questions

What people ask us.

How long does a custom home take?

Construction is typically nine to fourteen months once permits are issued. The part people underestimate is everything before that: design, engineering and agency review routinely add six months or more depending on the jurisdiction and the complexity of the site. We give you a phase by phase schedule at the outset and update it monthly, including when it slips.

Do I need an architect first?

Not necessarily first. Involving a builder during design rather than after it is how budgets stay attached to reality: we can tell you what a given roof geometry or foundation condition involves while it is still a line on a drawing. We work with your architect if you have one, and can introduce you to architects we trust if you do not.

How do payments work on a build this size?

By milestone draw schedule tied to completed phases, set out in the contract before work starts. If you are using construction financing, your lender will have its own inspection and draw process, and we will work to it. We will not ask for large sums ahead of the work they correspond to.

What happens if things change mid build?

Allowances are stated explicitly in your contract for items not yet selected, so you know what is assumed. Anything beyond an allowance, or any genuine unforeseen site condition, is documented, priced and signed as a change order before the work happens. You will never see a charge you did not approve in advance.

Also consider

Related.

Custom homes

Talk to us before
you buy the lot.

A feasibility conversation early is the cheapest insurance on the whole project, and occasionally the most valuable advice we give.

Call
(301) 305 3431
Email
courageous.b.c@outlook.com
Hours
Monday to Friday, 7:30am to 5:30pm
Saturday by appointment
Book a free visit Call (301) 305 3431